Day 32 - May 22, 2010

We had another work session with 6 team members present. We were visited by KGW TV news, channel 8, which ran a story on their 5 PM and 5:30 PM news programs. A written version of the KGW story can be viewed at:
http://www.kgw.com/lifestyle/Local-Teens-Build-Airplane-94673834.html

It is a very positive story, and we are thankful to them for taking the time to do this and give our program a little local exposure. 

We made good progress on the canopy on Saturday. It is now drilled to the frame and the fit looks very good. The cowling installation is also well along and looking good. The vertical stabilizer and rudder got their tip fairings finished, sanded, and installed.  The vertical stabilizer is now permanently installed on the fuselage.

No comments:

Post a Comment