Day 12 - January 25, 2014

Some wing parts were finally in use today.

Team Green got a headstart on the wing kit this session, and spent the day working on the wing spars. This included preparing the attach angles, doublers, and tie-downs; then attaching all those parts. The students got to practice tapping the tie-downs in order to fit an eye screw. The spars will serve as the main framework for the wings, providing the most support for the forces and weight loads placed on them.


Aside from that section, Teams Blue and Red both worked on the fuselage side skins. The pieces required a lot of preparation: cutting, dimpling, deburring, priming, countersinking; practically every technique was used before actually riveting them upon the fuselage structure.

 
Team Purple was split into two sub-groups: one worked to finish constructing the map box and began work on the supporting pieces for the battery and oil tank; the other group finished the upper firewall assembly and began planning the fuel line system.


Day 11 - January 18, 2014

Things were once again alive and active here at the hangar.

After some of the members finished fastening the bottom skin onto the fuselage, the structure was handed off to Team Purple to rivet the step floors, attach the baggage bulkhead, and install the systems block studs.



Team Red continued working on the brake system, and test-fitted the assembly into the lower front fuselage section. The section was finally attached to the entire fuselage structure, an additional piece to the growth of its construction.


The Green and Purple teams helped prepare the instrument panel along with its various parts and assemblies, including the map box and center instrument panel where the radio will reside.


Team Blue finished the roll bar and started constructing the baggage bulkhead assembly which will eventually connect to the bar and attach to the plane tailcone.


The side skins and roll bar assembly are next in line to become attached to the fuselage.

Day 9 - January 4, 2014 & Day 10 - January 11, 2014

These past couple of weekends have been really productive and busy here at the hangar. The teams continued to work on the fuselage skeleton and were able to complete and join all the required framework for the front fuselage. This included placing and securing the control column which will help direct the pitch of the airplane. 

Upon completion of the interior assemblies, members of the Green and Purple teams helped prepare and rivet the corner skins on the fuselage. It was exciting to see some exterior body components on the plane.


Team Blue spent the day assembling the roll bar of the cockpit. This piece will eventually attach to the center of the fuselage, delineating the cockpit from the baggage area. It will serve as a structural strengthener all the while providing some form of protection to the pilots in case of an aircraft overturn.


Teams Red and Purple worked on assembling and preparing the bottom skin. The big finale of the day was attaching the large piece to the fuselage. The entire assembled section had to be turned upside down in order for easy access to attach it. Most of the students spent the last half hour of the session working together to align and rivet the skin.


A couple of Red team students started the task of assembling the rudder pedals and brake system.

 

We also got a little sneak peek at the wing kit, which will be the next big project to tackle after completing the fuselage.

Day 8 - December 28, 2013

We are at the point in the fuselage kit where we are making lots of visual progress.  The skeleton of the fuselage is coming together quite nicely.
 
The Red and Purple teams completed their respective sections of the plans and joined their projects together at the end of the work session.  This will be the center section of the airplane, where the fuel tank will eventually be mounted and where the occupants will sit.
 

Team Blue completed the forward lower fuselage which is now waiting to be attached to the main fuselage assembly.
 

Team Green spent the day working on the forward seat bulkhead.  This is a complicated piece, as there are quite a few different components that attach to it including the mounts for the control sticks.
 

Day 7 - December 21, 2013

It is exciting to see the progress and the excitement around the TeenFlight hangar on Saturdays.  The TeenFlight 3 crew is really getting into the build.  The mentors divided the students into four teams: Purple, Red, Green, and Blue.  Each of these teams consists of three or four students.  The teams have mentors that work directly with them on their individual projects.  Because the fuselage kit has so many different facets to it, each team has its own project to work on.  These small projects will eventually join together as the fuselage of the airplane.   
 
The blue team continued on the forward lower fuselage section of the fuselage kit. 
 

Teams Green and Purple spent their time preparing seat ribs, baggage ribs, the forward cabin bulkhead, and other small assemblies.
 

Team Red finished the center section and began attaching the baggage ribs and floors to the center section.
 

Day 5 - December 7, 2013

Airplane parts are here! The fuselage kit magically showed up at the hangar for us to begin work on.  The plans sequences the tail kit as the first kit to be built.  Once the tail kit is complete, the builder moves on to the wing kit and then finally on to the fuselage kit.  However, the plans are laid out for a single person building the airplane and the idea is to get them building the easier (and cheaper) parts first where they will gain experience on parts that are easy to replace if need be.  For a few reasons, the TeenFlight crew has decided to switch the sequencing around a bit to suit our needs.  With the last two projects we have progressed more or less with the sequence laid out by the plans.  The problem was that once we got to the fuselage section there was not enough work for a dozen students.  This required splitting the students up into two or three teams to come on alternating weeks.  By starting with the fuselage kit we hope to hit that "bottleneck" soon in the build process and be able to have the wing and tail kits available so there will not be a surplus of willing students and a lack of available work.


All the students finished their toolbox projects this week and now have the basic skills necesary to begin construction of the airplane.


After inventorying the fuselage kit, the students were split up into four teams: Red, Blue, Green, and Purple.  Each team was assigned a specific place in the plans to begin work.  For the last hour or so of the day, we actually began to work on real airplane parts! 
 


 

Day 2 - November 16, 2013 & Day 3 - November 23, 2013

TeenFlight 3 is in full swing.  We have been practicing aircraft construction skills by each building a practice project called OP-51.  This project covers 51 different techniques and provides a good place to learn how to fix mistakes.  

A completed OP-51 project

After we finished the OP-51 project, we began on the final practice project: the toolbox.  We each received a toolbox kit, and by the end of Day 3, we had all begun construction on them.

A toolbox project under construction







TeenFlight 3: Day 1 - November 9, 2013

It is my pleasure to announce that the TeenFlight program has begun its third RV-12 build project.  Today was the first Saturday session with the new batch of students.  In all there are thirteen students from various backgrounds and ages ranging from 14 to 17.

  

This first session served primarily as an orientation session for students to get acquainted with the mentors and begin to learn a few basic procedures required to build an airplane.  Instead of having one mentor lecture for the entire day, it was decided by the group of about a dozen mentors that the task of teaching should be divided up in an attempt to make the material more interesting to the students.  As well as lectures  about safety, material preparation, drilling, and riveting, the students completed their first project: a name tag.  At the end of the day, and after more lecturing, we dove into the OP-51 instruction project.

Another point of interest is that the TeenFlight 2 RV-12 has successfully been sold!  We are very excited about this as it will provide the needed funds for the purchase of the RV-12 kit for the TeenFlight 3 project.

Paint, Graduation, and off to OshKosh!

Over the last weeks, the TeenFlight crew has been very busy preparing N212TF for its coat of paint, and for its trip to OshKosh.  Last week, it was painted at the Vans Aircraft factory in the same paint scheme as its older brother, N112TF.


Here is the finished TeenFlight 2 RV-12, N212TF!  On Friday the 26th of July, N212TF will launch from Aurora State Airport for Airventure OshKosh.


On Saturday, July 20, 2013, TeenFlight held a graduation to celebrate the successful completion of two RV-12s


It has been a great ride!  In fact, there are rumors about TeenFlight 3 starting sometime soon.  Stay tuned for more!

First Flight and Flight Testing!


N212TF made its first brief flight on the morning of June 6, 2013 at the Portland Hillsboro Airport with Mr. Dick VanGrunsven at the controls. 

After some obligatory tweaking, the airplane began its flight testing a week later.  At this point, the airplane has about three hours on it and is going strong.
 

Day 70 - June 1, 2013

With the inspection finished, and the airplane mostly buttoned back up, we had very few things to complete to get the airplane in flying condition.  We wanted to accomplish every possible task so that the airplane would be ready to fly on a moment's notice when the weather improved.



All the upholstery went into the cabin as well as the ELT and all the access plates.



Day 68 - May 18, 2013 & Day 69 - May 25, 2013

TeenFlight 2 is legally airworthy!  Early on Saturday Mr. Frank Snead, DAR, came over to the TeenFlight hangar and inspected the RV-12.  The inspection was very fast, and he did not find anything amiss with the airplane.  After reviewing the aircraft paperwork, he awarded us our airworthiness certificate.
 
 
 

After the inspection was complete, we began the process of buttoning up the airplane.  This included installing all the cover plates, reinstalling the fuel tank, and installing the upholstery.
 
When all the cover plates had been installed, the interior of the airplane went from looking like this:
 

to looking like this:
 

 
 Stay tuned for more in the coming weeks including the first flight of the second TeenFlight RV-12.

Day 67 - May 11, 2013

The last few weeks have been fairly sparse on tasks at TeenFlight.  We have been waiting on the FAA to return our aircraft registration.  However we received that this week but are now waiting for approval to schedule a DAR (Designated Airworthiness Representative).  This week we completed a few small things that will help the airplane be ready for the DAR when he comes.

We installed the rest of the placard on the airframe and inside the cabin.


In order to weigh the airplane the seats and upholstery must be completely installed.  One of the mentors brought in some scales for us to use and, with those scales, we were able to calculate the empty weight of the airplane at each tire and from there find the balance of the airplane.


And finally, this is what happens right after someone pulls off the protective plastic cling-wrap on the canopy.



Day 64 - April 13, 2013 & Day 65 - April 20, 2013

Over the past two weeks we have been working on finishing the wheel fairing kit.  They went together very smoothly for the most part and look very good.  There are only a few things left to do with them before they are fully completed. 
 

Shown here are the brackets that the main gear fairings screw into.
 

The nose wheel fairing was probably the hardest fairing of the three to construct, because it screwed into the fork that holds the nose wheel (instead of brackets like on the main wheels) and had to clear the gear leg.
 

We installed more velcro for the interior panels.